JBY series hydraulic walking pile frame is our heavy equipment which is integrated by mechanical ,electrical and hydraulic system .It is specially made for SMW(Soil Mixing Wall) construction, double rotary bushing DTH drill, static drill grounding method etc .This pile frame not only can be hung with various model of SMW construction multi-axis drilling power head, 800 ~ 1200 double rotary casing drill power head, various specifications static grounding construction power head, but also can be used in suspension of hydraulic hammer, vibratory hammer, diesel hammer, long screw, half screw machines, and other kinds of pile foundation construction tools ,to adapt to the job under different working condition, the applicable scope is wide.

  • Features
  • Technical parameter
Features

Product main features:

1、Reasonable structure, advanced technology, stable performance, high configuration, multi-function, operation is stable and reliable, good appearance, easy disassemble, flexible use, good price.
2、Using the company "asymmetric walking chassis" patent technology (patent number: ZL201120546000.3), small ground pressure, improve the operation stability, strong ability to adapt.
3、The main platform adopt the whole box structure, column and diagonal bar, the shaft bracket structure and connection fasteners adopt high strength material, improve the fatigue strength.
4、The main pump, control valve, pressure meter, quick change of tubing connectors which adopts U.S Danfoss brand(imported original).Hydraulic winch, the electrical components adopts Italy, Germany brand,which have joint venture in domestic.
5、Column is provided with two fine adjustment mechanism,convenient, fast and accurate on pile location and column vertical degree .Column and brace section can be interchanged, can according to the requirements of the construction to adjust the total height of the post.
6、The hydraulic power source is motor drive, low noise, no pollution.Adopt guiding type electro-hydraulic control, the main and vice hydraulic winch all uses hydraulic proportional control ,which realize step-less speed regulation, work steady, operation flexible.
7、Driving room reserved intelligent monitoring system installation location (optional), on the premise of provide standard column with angle gauge, available with inductance load angle monitor (optional), instant feedback column tilt and the size of the drawing load, sound an alarm in dangerous situation.
8、The whole machine adopts building-block type and easy assembly, shaft bracket used telescopic folding structure, platform overhanging beam powered by hydraulic cylinder and use pin shaft rotary structure, removes the trouble of disassembling.Handling down the tubing connection with quick change connectors,easy disassemble, pillar can put up frame work by itself , the overall structure is simple,disassemble ,transportation, use, convenient maintenance, high construction efficiency.  

Technical parameter
ItemJBY80
Control SystemHydraulic control
Pillar supportThree-point support
Pillar height(m)22.5
Pillar diameter(mm)630
Pillar track dimension and space(mm)330×70/600×102
The inclination of pillar12/5
Gradeability3
Platform rotary angle0-360
Platform rotary speed15
Long boat moving speed(m/min)0-4.3
Long boat pace(mm)2000
Short boat moving speed(m/min)0-4.3
Short boat space(mm)600
Long boat ground intensity of pressure (mpa)0.029
Short boat ground intensity of pressure (mpa)0.045
Motor power(kw)22
Hydraulic pressure(mpa)16
Long boat dimension(m)12×1.2(L×W)
Short boat dimension(m)3.76×2.5
Working dimension(m)12×6.96×25.5
Transportation dimension(m)10×3.04×2.15
Machine weight(t)65
Piling hammnerDiseal hammerHD80 & below
Hydraulic hammerHHP8 & below
Vibrating hammerElectric power110KW & below
Hydraulic powerSV100 & below
Drilling machineLong auger drill(mm)600 & below
Auger driller(mm)400 & below
Ma×. drilling depth(m)20